24 August 2007
Class MattersJonthan has been informed by the Operations Manager of the school that works in the class will be undergoing soon. This is after several members of the class have submitted a modest proposal to the school admin.
Solved ProblemsSo far, the following problems in class has been rectified by the school administration:1) Internet Cable and Internet Connection2) Hindges of the doors of the class3) 1 Air-Con at the back of the class
4) Disc Changer5) Dustbin [with markings of T21 and ohsevenveeoneone on it]Problems currently being solvedThe other aircon: This problem is still being fixed by the school administration.
Persisting Problems1) The Front Fan
2) Back of the class wall
3) Left Speaker
More detailed on the abovementioned stuff is in the posts below.
Samuel